Nalo

Structural engineering · Texas

Structural Engineering Plans for Texas Home Projects, Ready in About an Hour

You have a patio cover, deck, or ADU you want to build. Your city says you need a permit. The permit office says you need structural drawings.

So you start calling structural engineering firms in Texas. The quotes come back between $800 and $3,000. The wait is four days, sometimes two weeks. And you have not moved a single shovel of dirt.

NALO generates permit-ready structural plans for common Texas home projects in about 30 minutes to an hour, for $119. Every dimension is checked against your city's actual building code before the file is created.

Why Does a Patio Cover Need Structural Plans in Texas?

Because the moment you put a roof on it, the city stops treating it as a patio and starts treating it as a structure.

A structure has to hold up under wind load. It has to sit on footings deep enough for the local soil. If it attaches to your house, the ledger connection has to be detailed, because a badly attached ledger is one of the most common causes of deck collapse.

Texas has no statewide residential building code. Each city adopts its own version of the International Residential Code and then amends it. That is why Austin, Houston, and Fort Worth all want something slightly different from you.

Some cities go further. The Colony, for example, requires an engineer seal on foundation plans and on patio cover plans when the cover attaches to the primary structure. Austin and Round Rock ask for engineered drawings on most patio covers.

Your neighbor's approved plan set will not get you approved. The rules change by city, and sometimes by project size within the same city.

Why Do Structural Engineering Firms Charge $800 to $3,000?

It is a fair question, and the answer is not that firms are overcharging you.

A licensed structural engineer is billing you for their time and their professional liability. For a 400 square foot patio cover, most of that time goes into work that is genuinely repetitive: pulling the city's code sheet, sizing a beam from a standard table, drawing a footing detail, and formatting ten sheets to the department's submission standard.

That work is real. It is also the same work, over and over, across thousands of nearly identical backyard projects.

NALO automates the repetitive part. The engineering judgment that actually requires a licensed professional stays with licensed professionals, which is exactly where it belongs.

What Is NALO, and What Is It Not?

We want to be direct about this, because it protects you.

NALO is a software tool. It produces construction documents for residential projects that fall inside Texas Occupations Code Section 1001.056, which exempts certain buildings from the requirement that plans be sealed by a licensed engineer.

NALO is not a structural engineering firm. We are not a registered engineering firm with the Texas Board of Professional Engineers and Land Surveyors, and we do not provide sealed drawings or professional engineering services.

What this means for you: if your project qualifies for the exemption, you do not need a seal, and NALO plans are built for exactly that situation. If your project falls outside the exemption, you need a licensed Texas PE, and we will tell you that before you pay rather than after.

The exemption generally covers residential structures with a total floor area under 5,000 square feet and no clear span greater than 24 feet on the narrow side. It does not cover windstorm certification work or slab design on expansive soil that meets the IRC expansive soil classification.

Most backyard patio covers, decks, pergolas, and small ADUs sit comfortably inside those limits. Confirm your specific project with your city before you build.

How Do You Get Your Plans? Four Steps.

  • Step 1: Enter your address. The moment you type it, we load your city's building code. Setbacks, height limits, wind load requirements, and the exact sheet list your department expects.
  • Step 2: Answer plain questions about your project. Dimensions, materials, how it attaches. No engineering vocabulary. Takes a couple of minutes.
  • Step 3: Upload your photos and survey. A few shots of your property plus your survey document. We use them to place your structure accurately on the site plan.
  • Step 4: Download your plan set. A 10-sheet PDF drawn to NCS and AIA standards at tabloid size. That is the same format your city's plan reviewer opens every day.

What Happens If Something Violates Code?

We stop you before the plan is generated, not after the city rejects it.

If your proposed patio cover sits two feet inside a required setback, you find out during the questions. The tool tells you the specific rule and the specific fix.

This is the part homeowners underestimate. Most permit rejections are not complicated engineering failures. They are setback violations, missing footing depths, or a ledger detail the reviewer could not find.

Checking those in real time is why the plans are built to pass on the first submission.

Which Texas Projects Does NALO Support?

  • Attached and freestanding patio covers
  • Decks, including elevated decks
  • Pergolas and shade structures
  • Accessory dwelling units within the size limits
  • Carports

If your project is outside these types, or larger than the exemption allows, the tool will tell you at the address step.

When Should You Hire a Licensed Structural Engineer Instead?

Sometimes the right answer is a firm, not software. Call a licensed Texas structural engineer if:

  • Your structure spans more than 24 feet between supports
  • Your project exceeds 5,000 square feet of floor area
  • You need windstorm certification for a coastal county
  • You are building a slab on expansive soil
  • You are altering a load-bearing wall or an existing foundation
  • Your city explicitly demands a sealed and signed drawing for your project type

We would rather send you to the right professional than sell you a plan your city will reject. Saving $700 on the wrong document costs you a month.

For Texas Contractors: What Are Engineer Fees Doing to Your Margin?

If you close 20 outdoor living jobs a month, engineer engagements at $800 to $1,500 each are one of your largest recurring line items.

NALO cuts that cost by more than 80% and removes the four-day wait entirely.

  • One flat rate per project
  • Two corrections included
  • Plans your city's reviewer recognizes on-site
  • No scheduling calls, no back and forth over email

Faster permits mean faster starts. Faster starts mean more jobs per crew per month.

NALO Compared to Hiring a Structural Engineering Firm

AttributeStructural Engineering FirmNALO
Typical cost$800 to $3,000$119
Turnaround4 days to 2 weeks30 minutes to 1 hour
Code checkAfter draftingBefore the plan generates
Sealed drawingsYesNo, exempt projects only
Complex or large structuresYesNo
AvailabilityBusiness hoursAny time

Both have a place. The firm is right for complex or non-exempt work. NALO is right for the standard backyard build that does not need a seal.

What Does Your Plan Set Include?

Your 10-sheet PDF is formatted to National CAD Standard and AIA layer conventions at tabloid size, which is what Texas building departments expect for residential submissions.

The set covers your site plan with the structure placed from your survey, framing and foundation details, elevations, and the code compliance notes your reviewer looks for.

Every dimension in the set was validated against your city's adopted code before the file was created.

Pricing

Structural drawings built to your city's exact codes — with a bundled 3D design option.

Permit Plan

$119

Permit-ready plans built to your city's exact codes.

Best value

Permit Plan + 3D Design

$299

Both, bundled. Best value.

3D Design

$229

Photorealistic renders of your finished project.

Frequently Asked Questions

No. The questions are in plain language. Dimensions, materials, and how the structure attaches. NALO handles the code work.

Ready to Skip the Four-Day Wait?

Your structural plans are about an hour away, not two weeks.